DEDICATED FREIGHT CORRIDOR ONGOING
WDFC
Western Dedicated Freight Corridor

01 — OVERVIEW
Project Overview
Six engagements across the Western Dedicated Freight Corridor — F1 and F2 packages completed in 2017, TM1 and TM2 in 2018, with TM3 and TM4 ongoing from 2019.
05 — EQUIPMENT USED
Road-rail vehicles across F1, F2 and TM1–TM4 packages
START A CONVERSATION
Planning a Similar Project?
Talk to our engineering team about the equipment and configuration for your requirement.